






Aluminium window installation is a precision-based process that involves fixing a pre-fabricated aluminium frame and glass system into a prepared wall opening. Proper installation ensures airtight sealing, structural stability, water resistance, and long-term durability.
Unlike traditional wood or steel windows, aluminium systems require accurate alignment, chemical anchoring, and sealing techniques to perform effectively.

Understanding window type is critical because installation varies:
Sliding Windows
Casement Windows
Fixed Windows
Tilt & Turn Windows
Openable + Fixed Combination Windows

Measuring tape
Spirit level
Laser level (advanced)
Drill machine
Screwdriver set
Hammer
Rubber mallet
Glass suction lifter
Sealant gun

Aluminium window frame
Glass panels
Anchor fasteners / screws
Silicone sealant
PU foam / gap filler
Rubber beading
Packers (plastic spacers)

Before installation, the site must be inspected to ensure the opening is structurally ready.
Wall strength (brick / concrete)
Opening dimensions
Level and alignment
External plaster completion
Sill slope for drainage

“Measure twice, install once”
Width (top, middle, bottom)
Height (left, center, right)
Diagonal check (for squareness)
| Parameter | Recommended Gap |
|---|---|
| Width gap | 5–10 mm |
| Height gap | 5–10 mm |
| Diagonal variation | ≤ 3 mm |

The wall opening must be cleaned and prepared.
Remove dust, debris, loose plaster
Wet the surface slightly (for bonding)
Check sill slope (outward angle)

Frame Unpacking & Inspection:-
Scratches or dents
Frame squareness
Proper corner joints
Accessories availability

To verify fit before final fixing
Place frame inside opening
Check alignment and gaps
Mark fixing points
Vertical (plumb)
Horizontal (level)
Square (equal diagonals)

Spirit level
Laser level (advanced accuracy)
Drill holes in frame
Mark wall positions
Drill wall
Insert anchor fasteners

| Frame Size | Anchor Distance |
|---|---|
| Small window | 300–450 mm |
| Large window | 450–600 mm |

Tighten screws gradually
Avoid over-tightening (frame bending risk)
Re-check alignment after fixing

PU Foam
Cement mortar (rare)
Fill gap evenly
Avoid overfilling
Allow curing
Waterproof Sealing:-
Silicone sealant
Outer perimeter
Bottom sill joint
Prevent water leakage
Improve insulation

Clean frame grooves
Place rubber gasket
Install glass using suction tool
Fix with beading

Beading holds glass in position.
Clip-on beading
Screw-fixed beading
Includes:
Handles
Locks
Hinges
Rollers (sliding windows)

Smooth movement
No friction
Proper roller adjustment
Apply outer silicone finishing
Smooth edges
Clean excess material

Remove protective film
Clean glass
Polish aluminium frame
Frame alignment
Smooth operation
No air gaps
Proper sealing
Lock functionality

Laser leveling systems
Chemical anchoring
Double sealing system
Thermal break installation


Use gloves
Use safety shoes
Avoid working at height without harness
| Window Type | Installation Time |
|---|---|
| Small | 1–2 hours |
| Medium | 2–4 hours |
| Large | 4–6 hours |
Window size
Glass type
Labour charges
Location

Clean tracks regularly
Lubricate rollers
Check sealant annually

Aluminium frame: 20–30 years
Sealant: 5–10 years
Hardware: 5–15 years
Site inspection
Measurement
Surface prep
Frame placement
Fixing
Sealing
Glass installation
Final inspection

Always allow expansion gap
Use branded sealant
Prefer powder-coated aluminium
Ensure proper drainage

Measuring wall opening
Checking level
Inspecting wall strength
Checking sill slope
Marking installation area
Identifying obstacles
External wall condition
Internal wall condition
Tools preparation
Planning layout

Width measurement
Height measurement
Diagonal measurement
Tape usage
Marking points
Recording dimensions
Checking variation
Double verification
Frame comparison
Final measurement sheet

Frame placement
Using packers
Level checking
Drilling frame
Drilling wall
Anchor insertion
Screw tightening
Alignment check
Gap checking
Fixed frame

PU foam filling
Gap sealing
Silicone application
Smoothing sealant
Outer sealing
Waterproofing
Cleaning excess
Final finishing
Edge smoothing
Completed seal

Glass lifting
Gasket placement
Glass positioning
Beading fixing
Frame locking
Checking alignment
Cleaning glass
Final inspection
Smooth finish
Installed wind

Our company is a Sole Proprietorship (Individual), which has settled its main head office at , Hyderabad, Telangana. from where all the business related activities are keenly monitored by skilled professionals.
Website security powered by MilesWeb